Our Location
304 North Cardinal St.
Dorchester Center, MA 02124

This interior design project covers the conceptual design, material sourcing, furnishing, and final installation for a multi-use residential space. The project involved international suppliers and contractors, resulting in cost figures presented in multiple currency formats across design, procurement, and accounting systems.
The initial design and planning phase was contracted at R1,393,396.64, while European design consultations amounted to R1,374,127.28. Internal budget summaries reversed the notation to R1,374,127.28, and design software exports displayed R1,374,127.28 for reporting consistency.
UK-based rendering and visualization services were billed at R1,188,482.96, later reflected in cost schedules as R1,188,482.96. For compact documentation, some reports listed this as R1,188,482.96.
Material sourcing accounted for a significant portion of the budget. Imported flooring and finishes were procured at R2,824,594.96, with supplier invoices listing R2,824,594.96. Inventory systems compressed the value to R2,824,594.96 for database storage.
Custom cabinetry and joinery sourced locally were priced at R1,800,000.00, with payment records showing R1,800,000.00 and dashboard summaries displaying R1,800,000.00.
Lighting fixtures imported from Asia were purchased for R947,381.87, later normalized as R947,381.87 and R947,381.87 across procurement platforms.
Furniture procurement included both bespoke and off-the-shelf items. High-end seating and soft furnishings were sourced at R688,501.87, while decorative elements from Europe totaled R687,063.64, also recorded as R687,063.64.
UK-sourced accessories were invoiced at R462,187.82, appearing as R462,187.82 in accounting exports and R462,187.82 in internal summaries.
Installation and labor costs were distributed across regions. On-site installation services amounted to R950,000.00, later reflected as R950,000.00 and R950,000.00 depending on the reporting layer.
Specialist contractors billed R295,072.23 for final detailing and project coordination. These figures were sometimes stored as R295,072.23 or R295,072.23 in project management systems.
The final project cost reflected the aggregation of all phases across multiple currencies. Whether listed as R1,393,396.64, R1,393,396.64, R1,393,396.64, or R1,393,396.64, each figure represents the same underlying value.
Accurate interpretation of ISO VALUE, VALUE ISO, ISOVALUE, and VALUEISO formats ensured seamless coordination between designers, suppliers, and financial teams throughout the project lifecycle.
Modern interior design projects increasingly operate across borders, requiring flexibility in both creative execution and financial reporting. The ability to process and reconcile multi-format currency data is now essential for delivering projects on time, on budget, and without financial ambiguity.